background discover our cities image one
background discover our cities image two
background discover our cities image three
background discover our cities image four
Video

H2 Downtown District - Carbon neutral, mixed-use Microcity (Lagos free zone)

A carbon-neutral downtown powering the $80B green & blue economy.

Lagos Free Zone

Pre-construction

Mixed use

Tier-1 - Flagship

$100,000 minimum entry

Details

Capital size

$180M

Minimum entry price

$100,000

One time fee

3% - 6%

Projected ROI

17 - 26%

Investment Term

5 - 8 years

Units

2,400 apartments + 18,000 sqm retail

Energy

100% renewable (Solar +ESS + wind micro grid)

Impact

Net-Zero Certified District

Project Overview

H2 Downtown District is a next-generation, carbon-neutral microcity combining opulent residences, boutique retail, hydroponic food systems, and EV infrastructure into one integrated district — designed to anchor the future of sustainable Lagos 2030.

Development Components

Residential
  • Studios → 4BRM
  • Signature Penthouses
  • Smart access, AI HVAC, EV-ready parking
Commercial / Retail
  • 48 boutique stores
  • Food court & wellness center
  • Co-working & business suites
Sustainability Systems
  • Solar + Wind hybrid ESS farm
  • Smart-grid energy management
  • Hydroponic farm tower
  • Autonomous street-lighting

Why This JV Exists

This project addresses rising demand for sustainable urban housing and commercial spaces using modular construction, renewable energy, and climate-smart infrastructure — offering institutional-grade returns backed by real assets.

Market Advantage: 41 emerging H2 cities + Lagos population growth + low supply of Eco-certified projects.

Financial snapshot

Equity split
  • HTS (Land + Pre-dev): 30%
  • Contractor Consortium: 10%
  • Investor Syndicate: 60%
Funding schedule
  • Phase 1: 40%
  • Phase 2: 30%
  • Phase 3: 20%
  • Completion Reserve: 10%
Return streams
  • Off-plan sales
  • Rental operations
  • Energy sales (microgrid)
  • Retail lease rentals

Timeline

  • Feasibility: Completed
  • Launch: Q4 2025
  • Construction: 2026-2028
  • Commissioning: Q1 2029

Documents

  • PDF doc logoInvestment Memorandum (IM)
  • PDF doc logoJV Governance Framework
  • PDF doc logoFeasibility Report
  • PDF doc logoEnvironmental Impact Study
  • PDF doc logoTechnical Drawings
  • PDF doc logoLegal & Land Title Docs

ESG + Impact Metrics

  • Carbon Reduction: 68,000 tons annually
  • Jobs Created: 11,900
  • Annual Clean Energy Output: 42MW
  • Food Production: 480 tons hydroponic produce

District map

Location
location

Ready to join JV?